Construction, operations and maintenance
==Construction, operations and maintenance==
[[Image:SubsurfaceDam.jpg|thumb|right|300px|Mechanics of a subsurface dam.]]
The dam can be constructed of concrete, masonry, blockwork, stone-filled gabions with waterproof membranes such as plastic sheet or clay layer, or stabilised soil. 
* Build the crest of the underground dam at least 1 metre beneath the ground surface, so the land does not become water-logged.
* Subsurface dams should have wing walls, just like a [[sand dam]] does, where you can pile up rocks so that erosion does not occur.
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits