* Build the crest of the underground dam at least 1 metre beneath the ground surface, so the land does not become water-logged.
* Subsurface dams should have wing walls, just like a [[sand dam]] does, where you can pile up rocks so that erosion does not occur.
* Water can be abstracted by a well a short distance up- stream upstream of the dam, or by a drain system which collects water from the upstream base of the dam and leads it to the downstream side to a well or gravity-pipe system.
* Where possible, a flushing valve is installed to facilitate cleaning of the subsurface reservoir.
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor