Regions with highly erratic rainfall often have rivers with temporary seasonal sandy bed streams. They only experience heavy water run-off for short periods of time after rain. During such periods of high flows, large quantities of sand are transported downstream. Some sand can get trapped on the upstream sides of rock outcroppings along the stream. The sand traps form natural water storing aquifers. Sand dam technology provides a means to reproduce this water collecting mechanism and to increase the size of existing aquifers.
==Construction, operations and maintenance==
[[Image:Sand dam diagram.JPG|thumb|right|150px|Cross section of a sand dam]]
[[Image:Sand dam trench.JPG|thumb|right|150px|Excavation of a trench for sand dam construction]]
First a trench needs to be dug. Its position is marked out using pegs. Then it is excavated and the soil placed downstream. It can also be dug out into bedrock. It should then be checked for weathering zones and cracks. Round bars are placed vertically along the trench to reinforce it. Then a foundation is laid consisting of 2 layers of cement with barbed wire in between. Once this has set, the trench is filled with masonry of mortar and hardcore. The wing walls and final dam wall can then be constructed. Finally any exposed parts of the construction are plastered.
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu