Changes

Jump to: navigation, search

Talibon Slaughterhouse Wastewater Retrofit

3 bytes removed, 23:32, 2 September 2016
Wastewater Treatment Concerns
=== Wastewater Treatment Concerns ===
[[File:Talibon2.png|right|200px]]
{| cellspacing="1" cellpadding="1" border="0" style="width: 100%"
|-
An initial recommendation is to minimize waste. Since the wastewater treatment infrastructure is already installed, reducing the volume and strength of the wastewater to be treated to match the infrastructure is one option. The facility should also follow best practices. For example, collecting the blood and offal from the slaughtering operation will help reduce organic loading and waste volume, making the wastewater easier to treat.  In addition, covering the influent channel will minimize rainwater entering the system, which will maximize wastewater detention time through the system.
| [[File:Talibon2.png|right|200px]]
|}
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu