Changes

Jump to: navigation, search

Jetting - EMAS method

113 bytes added, 05:14, 17 January 2013
Construction, operations and maintenance
{|style="border-style: solid; border-width: 1px 1px 1px 1px; text-align: center; background-color: #efefef" align="1center" cellspacingwidth="070%"
|-
! scope="col" |[[Image:Emas2.png|thumb|rightcenter|250px200px|Setting up the light-weight drill tower.]]! scope="col" |[[Image:Emas4.png|thumb|rightcenter|250px200px|Installing the lever, used to move the drill stem up and down.]]! scope="col" |[[Image:Emas3.png|thumb|rightcenter|250px200px|Drilling in process: one person operates the lever, one person guides the drill stem and rotates it, the third person operates the mud pump.]]! scope="col" |[[Image:Emas8.png|thumb|rightcenter|250px200px|Putting in an EMAS flexi-pump.]]
|-
|[[Image:Emas7.png|thumb|rightcenter|250px200px|Wetting the cement for the pump base.]]|[[Image:Emas5.png|thumb|rightcenter|250px200px|The mud pump in close-up.]]|[[Image:Emas6.png|thumb|rightcenter|250px200px|The well screen, slits cut with saw, end capped. Later, a sock is pulled around the screen.]]|[[Image:Emas9.png|thumb|rightcenter|250px200px|After the well screen is put in the well, the well is developed by a special tool.]]
|}
 
==Costs==
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu