Changes

Jump to: navigation, search
Construction, operations and maintenance
==Construction, operations and maintenance==
[[Image:Tyro weir.jpg|thumb|right|250px|Tyrolian weirs are meant to intake water from mountain torrents. Photo: [http://www.iahr.org/membersonly/grazproceedings99/doc/000/000/080.htm Vienna University of Technology]]]
 
A Tyrolean weir can either consist of parallel rods or a perforated plate, installed in the flow direction over the width of the stream with a 15-30 degree downward slope. Large stones, branches and large leaves cannot pass between the rods, and are prevented from entering the gutter. Because the rods / plate slopes downward, the material in the stream is pushed downstream, until it drops over the end of the weir.
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu