Changes

Jump to: navigation, search

Hippo roller

906 bytes added, 04:42, 29 August 2012
Local Manufacturing
Training in the operation and maintenance of the machine is conducted in South Africa.
 
'''Creating a Hippo Roller'''
Stage I -Loading/Unloading station:<br>
* Raw material (polyethylene powder) is loaded into each mould-set (drum & screw cap).
* On completion of the cycle the moulds are opened and the completed mouldings are removed.
* New raw materials are added for the next cycle.
 
Stage II -The Heating station:<br>
* With the moulds inside the oven, the burner fires up and begins to melt the powder inside the moulds.
* During this phase the mould is constantly rotated in a predetermined pattern allowing the molten raw material to flow and take the shape of the mould.
 
Stage III -The Cooling phase:<br>
* While the moulds continue to be rotated they are cooled down by blowing air and spaying water .
* The molten raw material solidifies in the shape of the mould.
 
Finished product:<br>
* The completed mouldings are removed from the mould and any excess material is scraped off.
TO PURCHASE OR LEARN ABOUT LOCAL MANUFACTURING: [http://www.hipporoller.org/ Hipporoller.org]
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu