Changes

Jump to: navigation, search

Concrete production and drought

1 byte added, 00:00, 5 June 2012
no edit summary
==Construction, operations and maintenance==
[[Image:concrete graph.jpg|thumb|right|300px|Concrete strength with curing.<br> Neville, A.M. (1981) Properties of Concrete. Pitman.]]
====Use high quality ingredients====
====Curing====
[[Image:concrete graph.jpg|thumb|right|300px|Concrete strength with curing.<br> Neville, A.M. (1981) Properties of Concrete. Pitman.]]
 
Ensure adequate curing - this is one of the most important aspects to making strong concrete, but is often bypassed in the field due to lack of water, knowledge or organization. Adequate curing is necessary to keep the process of hydration going as long as possible – the longer the time, the stronger the concrete. This hydration process will stop once the concrete has dried out, resulting a strength of concrete according to the time of curing. Although curing can continue even for years, 7 and 28 days are normally quoted (see graph) – curing should last at least 7 days, if not longer especially in cold weather. Curing involves sprinkling water on the concrete every day as well as covering it, preferably in a shady area. Covering can be done with material like plastic or sacking, but covering in wet sand also works well, as does putting the concrete entirely in water.
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu