Difference between revisions of "Fossa alterna"
(One intermediate revision by one other user not shown) | |||
Line 25: | Line 25: | ||
== Costs == | == Costs == | ||
− | * Construction of total system, including material | + | * Construction of total system, including material & labour - About US$ 20 - 30 (Mozambique). |
== Applying conditions == | == Applying conditions == | ||
Line 39: | Line 39: | ||
This [http://www.bvsde.paho.org/bvsacd/cd66/ToiletsCompost/cap4.pdf document] contains a lot of information about building, maintaining a fossa alterna. | This [http://www.bvsde.paho.org/bvsacd/cd66/ToiletsCompost/cap4.pdf document] contains a lot of information about building, maintaining a fossa alterna. | ||
+ | |||
+ | {{Joinus}} | ||
== External links == | == External links == | ||
* General information about Fossa alterna [http://www.wateraid.org www.wateraid.org ] | * General information about Fossa alterna [http://www.wateraid.org www.wateraid.org ] | ||
* Zimbabwe [http://aquamor.tripod.com aquamor.tripod.com ] | * Zimbabwe [http://aquamor.tripod.com aquamor.tripod.com ] |
Latest revision as of 20:42, 22 December 2008
The Fossa Alterna is a shallow alternating double pit system, collecting and compos ting excreta from a dry toilet. Two shallow pits are dug next to each other (0.5 1.5 metre deep). Dry leaves are added to the pit base before use, and thereafter soil (and ash) are added after each defecation. When a pit is 3/4 full, the concrete slab and portable superstructure are placed on the second pit. Excreta is not only collected, but also (pre-) treated by filling the original pit with soil and leaving it to compost. By the time the second pit is full, the first pit is emptied after which the slab and superstructure is put back on top of it and the pit is reused. After composting, the content of the first pit can be used as fertiliser. The best compost time is more than 12 months. The material can be excavated earlier at 6 months, but is best transferred at this stage to a pit in which a tree will be planted.
Advantages | Disadvantages |
---|---|
The design reduces the need to handle fresh faecal material. Shallow depth of pit required. |
No full recovery of nutrients. Space required. |
Contents
Capacity
- Small / medium sized family - Capacity: about 0.5-0.75 m³ - Filling time: 6-12 months
- Family with 10 users - Capacity: about 1 m³ - Filling time: 6 months
Costs
- Construction of total system, including material & labour - About US$ 20 - 30 (Mozambique).
Applying conditions
- The conversion of excreta into humus will not take place if the pit is flooded with water. Therefore, the pit should not be sealed and water used for anal cleaning should not enter the pit.
- Not applicable in areas with a high water table, with very loose soil (which could collapse), or very solid soil which would prevent drainage.
- In order to prevent water tables penetrating the pits and contaminating the water, pits should be shallow.
- Applicable in rural and peri-urban areas, where compost can be taken away and disposed of or, better still, used on agricultural fields.
- As with many sanitation systems, household members need to understand the key principles for efficient operation and maintenance and discipline is required for adding soil after each defecation.
Fossa Alterna manual
This document contains a lot of information about building, maintaining a fossa alterna.
|
External links
- General information about Fossa alterna www.wateraid.org
- Zimbabwe aquamor.tripod.com