Changes

Jump to: navigation, search
Construction, operations and maintenance
==Construction, operations and maintenance==
[[Image:SumpIntakeDiagram.JPG|thumb|right|300px|Sump intake diagram. Click image to zoom. <br> Drawing: [http://wwwWHO.bvsde.paho.org/eswww/tecapropiada/otratec/waterlin/tb22.pdf Waterlines.]]]
Operation is usually carried out by a caretaker. The sump must be checked daily for sufficient water inflow; any debris obstructing it must be removed, and any damage repaired. Most of the maintenance will be to the pump. The intake itself needs some cleaning and de-silting. If it caves in, or if the river or lake bank erodes, repairs have to be made. A sump inlet does not require special organizational arrangements.
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu