Changes

Jump to: navigation, search

Soak Pit

765 bytes added, 04:37, 17 October 2013
no edit summary
===Adequacy===
 
A Soak Pit does not provide adequate treatment for raw wastewater and the pit will clog quickly. A Soak Pit should be used for discharging presettled blackwater or greywater. Soak pits are appropriate for rural and peri-urban settlements. They depend on soil with a sufficient absorptive capacity. They are not appropriate for areas that are prone to flooding or have high groundwater tables.
===Health Aspects/Acceptance===
 
As long as the Soak Pit is not used for raw sewage, and as long as the previous Collection and Storage/Treatment technology is functioning well, health concerns are minimal. The technology is located underground and thus, humans and animals should have no contact with the effluent. It is important however, that the Soak Pit is located a safe distance from a drinking water source (ideally 30m). Since the Soak Pit is odourless and not visible, it should be accepted by even the most sensitive communities.
===Maintenance===
 
A well-sized Soak Pit should last between 3 and 5 years without maintenance. To extend the life of a Soak Pit, care should be taken to ensure that the effluent has been clarified and/or filtered well to prevent excessive build up of solids. The Soak Pit should be kept away from high-traffic areas so that the soil above and around it is not compacted. When the performance of the Soak Pit deteriorates, the material inside the soak pit can be excavated and refilled. To allow for future access, a removable (preferably concrete) lid should be used to seal the pit until it needs to be maintained.
Particles and biomass will eventually clog the pit and it will need to be cleaned or moved.
===Field experiences===
{| style="width: 70%; text-align: justify; background-color: #f5f5f5;"
|[[Image:rsr 644.jpg|thumb|none|200px|<font size="2"><center>Project 644</center></font>|link=http://wandelenvoorwater2014.akvoapp.org/en/project/644/]]
|'''Akvo RSR Project:''' [http://wandelenvoorwater2014.akvoapp.org/en/project/644/ Rwenzori Integrated School WASH Project]
HEWASA and JESE will jointly implement this 3-years school WASH program in Kabarole district in the West of Uganda. Not only 24 schools will be supplied with WASH facilities (Rainwater Harvesting Tanks, Ecosan Latrines and Handwashing facilities) but 72 surrounding communities will be included for household latrine construction through CLTS, hygiene and health education and promotion.
|}
 
<br>
===References===
 
* Ahrens, B. (2005). [http://cee.eng.usf.edu/peacecorps/5%20-%20Resources/Theses/Sanitation/2005Ahrens.pdf A Comparison of Wash Area and Soak Pit Construction: The Changing Nature of Urban, Rural, and Peri-Urban Linkages in Sikasso, Mali]. Peace Corp, USA. Detailed construction instructions.
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu