Plan Review
[[File:InstArrang1.png|right|200px]]
Regulators have an important role in verifying the information provided by the applicant about the proposed site for a wastewater system. The checklists, procedures and policies will help to ensure that site investigations are carried out fairly and consistently.
 
[[:File:SiteInspectionChecklist.docx|Site Inspection Checklist (.docx)]]
Plan reviews should be conducted by trained engineers with specific knowledge of wastewater management. Smaller cities may look to regional resources or the private sector to accomplish these tasks.
[[:File:SiteInspectionChecklistPlanReviewChecklist.docx|Plan Review Checklist (.docx)]]
==== Permitting ====
[[File:InstArrang4.png|right|200px]]
Inspection of the construction at defined points and milestones is required to ensure a quality product. Inspect facilities when sewer pipes are laid but not covered, when tanks are installed but not yet backfilled, and to verify leak tests and soils compaction. Some inspection tasks may be shared between building and health offices, or private sector contractors.
 
[[:File:ConstructionInspectionChecklist.docx|Construction Inspection Checklist (.docx)]]
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor