Difference between revisions of "Brick cement tank"

From Akvopedia
Jump to: navigation, search
Line 4: Line 4:
 
Brick cement tanks are a low cost option for storing water gained through water harvesting. In general it is cheaper than ferro-cement tanks and easier to build.
 
Brick cement tanks are a low cost option for storing water gained through water harvesting. In general it is cheaper than ferro-cement tanks and easier to build.
  
==Suitable conditions ==
+
==Suitable conditions==
 
The area should be suitable for [[rainwater harvesting]]. Volumes can be 0.5 to 30 m3.
 
The area should be suitable for [[rainwater harvesting]]. Volumes can be 0.5 to 30 m3.
  

Revision as of 03:42, 13 April 2012

Storage tank for rooftop harvesting icon.png
A brick-cement tank before the application of the cement.

Brick cement tanks are a low cost option for storing water gained through water harvesting. In general it is cheaper than ferro-cement tanks and easier to build.

Suitable conditions

The area should be suitable for rainwater harvesting. Volumes can be 0.5 to 30 m3.

Advantages Disadvantages/limitations
- Cheaper and easier to build than ferro-cement tanks


Construction, operations and maintenance

Construction of a small brick cement tank, Mozambique.

Materials consist of (local produced) bricks (or blocks of hard rock), cement and steel wire. Approximately 1 bag of 50 kg cement per m3 tank volume. The bigger the volume of the tank, the lower the amount of materials (and thus costs) per m3 tank volume.

Brick cement tanks are constructed by placing an upright ring of bricks in a circle, with 3 rings of steel wire tightened around them. If the tank diameter is bigger than 2 meters more rings are needed. A second, third and fourth ring of bricks are added and suitably tightened. Cement is then applied on the inside and outside of the brick walls and to cover the bottom. A metal or PVC outlet pipe can be installed at the bottom. Once the cement has been applied, the tank needs to be covered with paper or plastic and kept wet for 7 days to cure the cement. Another curing option is to fill it up after the second day of installation.

Maintenance

  • Basic water quality testing is recommended during the first year, with further testing when water quality is in doubt. Eg. the 'HACH' pillo test, costing about US$ 1 per test. Treatment to manage microbiological quality is also recommended.
  • Removal of debris and overhanging vegetation from gutters and the roof (preventing stagnation of water in the gutters) is required.
  • Physical inspection and repairing cracks with cement is also needed.

Cost

  • Brick cement tank of 1 m3: 1 bag of cement, 100 bricks, 1 kg of wire US$ 20
  • Brick cement tank of 6 m3: 3 bags of cement, 300 bricks, 3 kg of wire US$ 40
  • In Kenya, brick/cement tanks cost $37 per m of storage (21m3 tank cost $780).
  • In Sri Lanka, brick tanks cost 28 per m3 of storage (5m3 tank cost $140).

Country experiences

Brick cement tanks have been constructed in Nicaragua and Ghana, among other countries.

Manuals

Movies

External Links

Footnotes


Acknowledgements

References