Difference between revisions of "Practitioner's Tool / Planning and Promotions"
Line 16: | Line 16: | ||
|- | |- | ||
| style="width: 50%" | | | style="width: 50%" | | ||
− | *Step 1: [[Step_1:_Project_Description_and_Treatment_Information|Project Description and Treatment Information]]<br/> | + | *Step 1: [[Practitioner's Tool / Planning and Promotions / Step_1:_Project_Description_and_Treatment_Information|Project Description and Treatment Information]]<br/> |
− | *Step 2: [[Step_2:_Determining_the_Design_Flow|Determining the Design Flow]] | + | *Step 2: [[Practitioner's Tool / Planning and Promotions / Step_2:_Determining_the_Design_Flow|Determining the Design Flow]] |
− | *Step 3: [[Step_3:_Determine_Organic_Loading|Determining Wastewater Strength and Loading]] | + | *Step 3: [[Practitioner's Tool / Planning and Promotions / Step_3:_Determine_Organic_Loading|Determining Wastewater Strength and Loading]] |
− | *Step 4: [[Step_4:_Determining_Pretreatment_Needs_–_Grease|Determining Pretreatment Needs – Grease]] | + | *Step 4: [[Practitioner's Tool / Planning and Promotions / Step_4:_Determining_Pretreatment_Needs_–_Grease|Determining Pretreatment Needs – Grease]] |
− | *Step 5: [[Step_5:_Determining_Pretreatment_Needs_–_Commercial_laundry_services|Determining Pretreatment Needs – Commercial laundry services]] | + | *Step 5: [[Practitioner's Tool / Planning and Promotions / Step_5:_Determining_Pretreatment_Needs_–_Commercial_laundry_services|Determining Pretreatment Needs – Commercial laundry services]] |
− | *Step 6: [[Step_6:_Determining_Pretreatment_Needs_–_Markets|Determining Pretreatment Needs – Markets]] | + | *Step 6: [[Practitioner's Tool / Planning and Promotions / Step_6:_Determining_Pretreatment_Needs_–_Markets|Determining Pretreatment Needs – Markets]] |
− | *Step 7: [[Step_7:_Determining_Flow_Variability|Determining Flow Variability]] | + | *Step 7: [[Practitioner's Tool / Planning and Promotions / Step_7:_Determining_Flow_Variability|Determining Flow Variability]] |
− | *Step 8: [[Step_8:_Other_Factors_to_Consider|Other Factors to Consider]] | + | *Step 8: [[Practitioner's Tool / Planning and Promotions / Step_8:_Other_Factors_to_Consider|Other Factors to Consider]] |
| style="width: 50%" | | | style="width: 50%" | |
Revision as of 00:22, 3 September 2016
- Bottom-up Planning Process
- Evidence Gathering
- Rapid Technical Assessment
Starting the Development Process
Before choosing suitable treatment technologies two steps have to be followed: the source characterization and the site evaluation.
Source Characterization
Before you can design a wastewater system, you must first accurately determine the characteristics of the wastewater. If you do not, you may undersize it, in which case it will surely fail, or if you oversize it, you will waste money. In order to get an overview of important characterization criteria, have a look at the Source Characterization section.
To get started, you will need to download the "Source Characterization Tool" by clicking the link below. Follow the 8 steps below along with the tool to help you characterize your source. Within the tool, click the “Info” buttons for more information on a specific topic, or click the “Step” buttons to work your way through the tool. Here are the steps within the tool:
Site Evaluation
Site evaluation is critical to planning your onsite wastewater treatments systems project. Without an adequate site evaluation the implemented systems are more likely to fail. Get an idea of the most important site attributes in the Site Evaluation section.
A Site Evaluation Tool guides you through the process of evaluating the setting of your project. Download the tool linked below and follow the steps below for the information you will need as you use the tool.
|