Difference between revisions of "Leach Field"

From Akvopedia
Jump to: navigation, search
(References)
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<small-title />
+
{|style="float: left;"
<!-- table at top of page with logo, picture, Application level, Management level, and input-output tables -->
+
|{{Language-box|english_link=Leach_Field|french_link=Lit_d’infiltration|spanish_link=Campo_de_Filtrado|hindi_link=coming soon|malayalam_link=coming soon|tamil_link=coming soon | korean_link=coming soon | chinese_link=Coming soon | indonesian_link=Coming soon | japanese_link=Coming soon}}
 +
|}
 
{|width="100%"
 
{|width="100%"
 
|style="width:50%;"|{{santable_new|
 
|style="width:50%;"|{{santable_new|
sys1=[[Blackwater Treatment System with Infiltration|5]]|
+
sys1=[[Biogas System|5]]|
 
sys2=|
 
sys2=|
 
sys3=|
 
sys3=|
Line 20: Line 21:
 
ManPublic=X|
 
ManPublic=X|
 
Input1=Effluent |Input2= |Input3=| Input4=|Input5=|
 
Input1=Effluent |Input2= |Input3=| Input4=|Input5=|
Output1=- |Output2= | Output3= | Output4= | Output5=
+
Output1=None |Output2= | Output3= | Output4= | Output5=
|english_link=Leach_Field
 
|french_link=Lit_d’infiltration
 
|spanish_link=Campo_de_Filtrado
 
 
}}
 
}}
|[[Image:Leach_field.png |right|300px]]
+
|[[Image:Leach_field.png |right|500px]]
 
|}
 
|}
 
 
<br>
 
<br>
 
----
 
----
Line 33: Line 30:
  
 
[[Image:Icon_leach_field.png |right|80px]]
 
[[Image:Icon_leach_field.png |right|80px]]
'''A Leach Field, or drainage field, is a network perforated pipes that are laid in underground gravel-filled trenches to dissipate the effluent froma water-based Collection and Storage/Treatment or (Semi-) Centralized Treatment technology.'''
+
 
 +
'''A leach field, or drainage field, is a network of perforated pipes that are laid in underground gravel- filled trenches to dissipate the effluent from a water-based Collection and Storage/Treatment or (Semi-) Centralized Treatment technology'''
  
 
<br>
 
<br>
Effluent is fed into a distribution box which directs the flow into several parallel channels. A small dosing system releases the pressurized effluent into the Leach Field on a timer (usually 3 to 4 times a day). This ensures that the whole length of the Leach Field is utilized and that aerobic conditions are allowed to recover between dosings. Each trench is 0.3 to 1.5m deep and 0.3 to 1m wide. The bottom of each trench is filled with about 15cm of clean rock and a perforated distribution pipe is laid overtop. More rock covers the pipe so that it is completely surrounded. The layer of rock is covered with a layer of geotextile fabric to prevent small particles from plugging the pipe. A final layer of sand and/or topsoil covers the fabric and fills the trench to the ground level. The pipe should be placed 15cm from the surface to prevent effluent from surfacing. The trenches should be dug no longer than 20m in length at least 1 to 2m apart.
+
Pre-settled effluent is fed into a piping system (distribution box and several parallel channels) that distributes the flow into the subsurface soil for absorption and subsequent treatment. A dosing or pressurized distribution system may be installed to ensure that the whole length of the leach field is utilized and that aerobic conditions are allowed to recover between dosings. Such a dosing system releases the pressurized effluent into the leach field with a timer (usually 3 to 4 times a day).
 +
 
 +
===Design Considerations===
 +
Each trench is 0.3 to 1.5 m deep and 0.3 to 1 m wide. The bottom of each trench is filled with about 15 cm of clean rock and a perforated distribution pipe is laid on top. More rock is placed to cover the pipe. A layer of geotextile fabric is placed on the rock layer to prevent small particles from plugging the pipe. A final layer of sand and/or topsoil covers the fabric and fills the trench to the ground level. The pipe should be placed at least 15 cm beneath the surface to prevent effluent from surfacing. The trenches should be dug no longer than 20 m in length and at least 1 to 2 m apart. To prevent contamination, a leach field should be located at least 30 m away from any drinking water source. A leach field should be laid out such that
 +
it will not interfere with a future sewer connection. The collection technology which precedes the leach field (e.g., Septic Tank, S.9) should be equipped with a sewer connection so that if, or when, the leach field needs to be replaced, the changeover can be done with minimal disruption.
  
 
<br>
 
<br>
 
{{procontable | pro=
 
{{procontable | pro=
- Can be used for the combined treatment of blackwater and greywater. <br> - Has a lifespan of 20 or more years (depending on conditions). <br> - Low to moderate capital cost, low operating cost. | con=
+
- Can be used for the combined treatment and disposal of effluent
- Requires expert design and construction. <br> - Requires a large area (on a per person basis). <br> - Not all parts and materials may be available locally. <br> - Pretreatment is required to prevent clogging. <br> - May negatively affect soil and groundwater properties.
+
- Has a long lifespan (depending on conditions)
 +
- Low maintenance requirements if operating without mechanical equipment
 +
- Relatively low capital costs; low operating costs
 +
| con=
 +
- Requires expert design and construction <br>
 +
- Not all parts and materials may be locally available <br>
 +
- Requires a large area <br>
 +
- Primary treatment is required to prevent clogging <br>
 +
- May negatively affect soil and groundwater properties
 
}}
 
}}
  
===Adequacy===
+
===Appropriateness===  
 
+
Leach fields require a large area and unsaturated soil with good absorptive capacity to effectively dissipate the effluent. Due to potential oversaturation of the soil, leach fields are not appropriate for dense urban areas. They can be used in almost every temperature, although there may be problems with pooling effluent in areas where the ground freezes. Homeowners who have a leach field must be aware of how it works and of their maintenance responsibilities. Trees and deep-rooted plants should be kept away from the leach field as they can crack and disturb the tile bed
Leach Fields require a large area and soil with good absorptive capacity to effectively dissipate the effluent.
 
 
 
To prevent contamination, a Leach Field should be located 30m away from a drinking water supply. Leach fields are not appropriate for dense urban areas. They can be used in almost every temperature, although there may be problems with pooling effluent in areas where the ground freezes.
 
  
Homeowners who have a Leach Field must be aware of how it works and what their maintenance responsibilities are. Trees and deep-rooted plants should be kept away from the Leach Field as they can crack and disturb the tile bed.
+
===Health Aspects/Acceptance===
 +
Since the technology is underground and requires little attention, users will rarely come in contact with the effluent and, therefore, it has no health risk. The leach field must be kept as far away as possible (at least 30 m) from any potential
 +
potable water source to avoid contamination.
  
===Health Aspects/Acceptance===
+
===Operation & Maintenance===  
 
+
A leach field will become clogged over time, although this may take 20 or more years, if a well-maintained and well-functioning primary treatment technology is in place. Effectively, a leach field should require minimal maintenance; however, if the system stops working efficiently, the pipes should be cleaned and/or removed and replaced. To maintain the leach field, there should be no plants or trees on it. There should also be no heavy traffic above it because this could crush the pipes or compact the soil.
Since the technology is underground and it requires little attention, users will rarely come in contact with the effluent and so it should pose no health risk. The Leach Field must be kept as far away as possible from (>30m) any potential potable water sources to avoid contamination.
 
  
 
===Upgrading===
 
===Upgrading===
 
 
A Leach Field should be laid out such that it would not interfere with a future sewer connection. The collection technology which precedes the Leach Field (e.g. [[Septic Tank]]) should be equipped with a sewer connection so that if, or when, the Leach Field needs to be replaced, the changeover can be done with minimal disruption.
 
A Leach Field should be laid out such that it would not interfere with a future sewer connection. The collection technology which precedes the Leach Field (e.g. [[Septic Tank]]) should be equipped with a sewer connection so that if, or when, the Leach Field needs to be replaced, the changeover can be done with minimal disruption.
 
===Maintenance===
 
 
A Leach Field will become clogged over time, although with a well-functioning pre-treatment technology, this should take many years. Effectively, a Leach Field should require minimal maintenance, however if the system stops working efficiently, the pipes should be cleaned and/or removed and replaced. To maintain the Leach Field, there should be no plants or trees above it and no heavy traffic, which may crush the pipes or compact the soil.
 
  
 
===References===
 
===References===
 +
* Crites, R. and Tchobanoglous, G. (1998). Small and Decentralized Wastewater Management Systems. WCB/McGraw-Hill, New York, US. pp. 905-927. (Book)
  
* Crites, R. and Tchobanoglous, G. (1998). [http://books.google.com/books/about/Small_and_decentralized_wastewater_manag.html?id=yx9SAAAAMAAJ Small and Decentralized Wastewater Management Systems]. WCB and McGraw-Hill, New York, USA. pp 905–927.
+
* Morel, A. and Diener, S. (2006). [https://www.susana.org/en/knowledge-hub/resources-and-publications/library/details/947 Greywater Management in Low and Middle-Income Countries. Review of Different Treatment Systems for Households or Neighbourhoods]. Eawag (Department Sandec), Dübendorf, CH.
  
* Polprasert, C. and Rajput, VS. (1982). [http://docs.watsan.net/Scanned_PDF_Files/Class_Code_3_Sanitation/323.2-82SE-884.pdf Environmental Sanitation Reviews: Septic Tank and Septic Systems]. Environmental Sanitation Information Center, AIT, Bangkok, Thailand.
+
* Polprasert, C. and Rajput, V. S. (1982). [https://www.susana.org/en/knowledge-hub/resources-and-publications/library/details/2995 Environmental Sanitation Reviews: Septic Tank and Septic Systems]. Environmental Sanitation Information Center, AIT, Bangkok, TH.
  
* [http://www.epa.gov USEPA] (1980). [http://www.epa.gov/nrmrl/pubs/625180012.html Design manual- on-site wastewater treatment and disposal systems. EPA-625/1-80-012]. Office of Research and Development, Municipal Environmental Research Laboratory, Cincinnati, Ohio.
+
* U.S. EPA (1980). [https://www.epa.gov/septic/onsite-wastewater-treatment-and-disposal-systems Design Manual. Onsite Wastewater Treatment and Disposal Systems]. EPA 625/1-80-012. U.S. Environmental Protection Agency, Cincinnati, OH, US.
  
 
===Acknowledgements===
 
===Acknowledgements===
 
{{:Acknowledgements Sanitation}}
 
{{:Acknowledgements Sanitation}}

Latest revision as of 03:42, 25 April 2021

English Français Español भारत മലയാളം தமிழ் 한국어 中國 Indonesia Japanese
Applicable in systems:
5
Level of Application
Household XX
Neighbourhood X
City

 

Inputs
Effluent


Level of management
Household XX
Shared XX
Public X

 

Outputs
None
Leach field.png




Icon leach field.png

A leach field, or drainage field, is a network of perforated pipes that are laid in underground gravel- filled trenches to dissipate the effluent from a water-based Collection and Storage/Treatment or (Semi-) Centralized Treatment technology


Pre-settled effluent is fed into a piping system (distribution box and several parallel channels) that distributes the flow into the subsurface soil for absorption and subsequent treatment. A dosing or pressurized distribution system may be installed to ensure that the whole length of the leach field is utilized and that aerobic conditions are allowed to recover between dosings. Such a dosing system releases the pressurized effluent into the leach field with a timer (usually 3 to 4 times a day).

Design Considerations

Each trench is 0.3 to 1.5 m deep and 0.3 to 1 m wide. The bottom of each trench is filled with about 15 cm of clean rock and a perforated distribution pipe is laid on top. More rock is placed to cover the pipe. A layer of geotextile fabric is placed on the rock layer to prevent small particles from plugging the pipe. A final layer of sand and/or topsoil covers the fabric and fills the trench to the ground level. The pipe should be placed at least 15 cm beneath the surface to prevent effluent from surfacing. The trenches should be dug no longer than 20 m in length and at least 1 to 2 m apart. To prevent contamination, a leach field should be located at least 30 m away from any drinking water source. A leach field should be laid out such that it will not interfere with a future sewer connection. The collection technology which precedes the leach field (e.g., Septic Tank, S.9) should be equipped with a sewer connection so that if, or when, the leach field needs to be replaced, the changeover can be done with minimal disruption.


Advantages Disadvantages/limitations
- Can be used for the combined treatment and disposal of effluent

- Has a long lifespan (depending on conditions) - Low maintenance requirements if operating without mechanical equipment - Relatively low capital costs; low operating costs

- Requires expert design and construction

- Not all parts and materials may be locally available
- Requires a large area
- Primary treatment is required to prevent clogging
- May negatively affect soil and groundwater properties


Appropriateness

Leach fields require a large area and unsaturated soil with good absorptive capacity to effectively dissipate the effluent. Due to potential oversaturation of the soil, leach fields are not appropriate for dense urban areas. They can be used in almost every temperature, although there may be problems with pooling effluent in areas where the ground freezes. Homeowners who have a leach field must be aware of how it works and of their maintenance responsibilities. Trees and deep-rooted plants should be kept away from the leach field as they can crack and disturb the tile bed

Health Aspects/Acceptance

Since the technology is underground and requires little attention, users will rarely come in contact with the effluent and, therefore, it has no health risk. The leach field must be kept as far away as possible (at least 30 m) from any potential potable water source to avoid contamination.

Operation & Maintenance

A leach field will become clogged over time, although this may take 20 or more years, if a well-maintained and well-functioning primary treatment technology is in place. Effectively, a leach field should require minimal maintenance; however, if the system stops working efficiently, the pipes should be cleaned and/or removed and replaced. To maintain the leach field, there should be no plants or trees on it. There should also be no heavy traffic above it because this could crush the pipes or compact the soil.

Upgrading

A Leach Field should be laid out such that it would not interfere with a future sewer connection. The collection technology which precedes the Leach Field (e.g. Septic Tank) should be equipped with a sewer connection so that if, or when, the Leach Field needs to be replaced, the changeover can be done with minimal disruption.

References

  • Crites, R. and Tchobanoglous, G. (1998). Small and Decentralized Wastewater Management Systems. WCB/McGraw-Hill, New York, US. pp. 905-927. (Book)

Acknowledgements

Eawag compendium cover.png

The material on this page was adapted from:

Elizabeth Tilley, Lukas Ulrich, Christoph Lüthi, Philippe Reymond and Christian Zurbrügg (2014). Compendium of Sanitation Systems and Technologies, published by Sandec, the Department of Water and Sanitation in Developing Countries of Eawag, the Swiss Federal Institute of Aquatic Science and Technology, Dübendorf, Switzerland.

The 2nd edition publication is available in English. French and Spanish are yet to come.