Construction, operations and maintenance
A river intake always requires a sufficient depth of water in the river. A submerged weir may have to be constructed downstream of the intake to ensure that the necessary depth of water will be available even in dry periods. This type of weir is only a small structure and cannot be expected to provide any storage or flow balancing. Ideally the weir should be founded on rock, to provide the best conditions with regard to bearing capacity, seepage and safety against sliding. Soils with a clay/silt content that reduce permeability and increases cohesion (but with low plasticity) are also acceptable as foundation materials. A key at the upstream toe of the weir will improve stability and an upstream apron will extend the seepage path and thus reduce seepage.
 
====Screens====
In water supply engineering, screens are used for various purposes: Removal of floating and suspended matter of large size which otherwise might clog pipelines, damage pumps and other mechanical equipment, or interfere with the satisfactory operation of the treatment processes. Fixed screens are used for this purpose and they are cleaned on site by hand or mechanically. Clarification of the water by removal of suspended matter even of small size, to lighten the load on the subsequent treatment processes. In particular screens are used to prevent filters from becoming clogged too rapidly.
 
Screening is done by passing the water through closely spaced bars, gratings or perforated plates. It does not change the chemical or bacteriological quality of the water. It serves to retain coarse material and suspended matter larger than the screen openings. Even when screened-out material forms a filtering mat of deposits, the screening still is purely of a mechanical nature. Bar screens usually consist of steel strips or bars spaced at 0.5-5 cm. If the amount of material expected to be screened out is small, the bars are set quite steeply, at an angle of 60-75° to the horizontal, and cleaning is done by hand using rakes. If larger amounts will be retained, cleaning by hand should still be feasible; to facilitate the cleaning work, the bars should be placed at an angle of 30-45° to the horizontal.
====Maintenance====
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu