Changes

Jump to: navigation, search

Practitioner's Tool / Determining the Design Flow

7 bytes added, 18:30, 22 September 2016
no edit summary
In this step, you will estimate the volume of wastewater each day that will require treatment (Hydraulic Loading). <br>
 
There are three methods:
#'''Review Similar Projects:''' Survey existing projects that will be similar to yours and try to determine if they have water meter readings or any estimate of water consumption you can review. In some cases, more accurate measurements can be made by estimating volume of source water delivery (number of buckets, run time for pumps).
''[[:File:Hydraulicdesignrates.pdf|More information...Hydraulic design rates (PDF)]]'' 
'''[[Step_3:_Determine_Organic_Loading|Proceed to Step 3]]'''
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu