Construction, operations and maintenance
[[Image:Sand dam diagram.JPG|thumb|right|250px|Cross section of a sand dam.<br> Diagram: Netherlands Water Project. <br>Click image to see details.]]
[[Image:Sand dam trench.JPG|thumb|right|250px|People excavating a trench. Source: [http://www.sswm.info/category/implementation-tools/water-sources/hardware/precipitation-harvesting/sand-dams RAIN (n.y.)]]]
First a trench needs to be dug. Its position is marked out using pegs. Then it is excavated and the soil placed downstream. It can also be dug out into bedrock. It should then be checked for weathering zones and cracks. Round bars are placed vertically along the trench to reinforce it. Then a foundation is laid consisting of 2 layers of cement with barbed wire in between. Once this has set, the trench is filled with masonry of or mortar and hardcore. The wing walls and final dam wall can then be constructed. Finally any exposed parts of the construction are plastered.
====Building the sand dam (and wing wall)====
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu