Changes

References, videos, and links
* If bunds are formed in a terrace-like design, the labour required for construction is estimated at 150 to 350 person days/ha for terraces and cut off drains. The cost of these structures is approximately $60-460/ha.
==ReferencesReference manuals, videos, and links==
* [http://www.unep.or.jp/ietc/publications/techpublications/TechPub-8a ''Sourcebook of Alternative Technologies for Freshwater Augumentation in Africa''], United Nations Environment Programme (UNEP), Division of Technology, Industry and Economics
* [http://www.fao.org/docrep/u3160e/u3160e00.HTM ''Water Harvesting: A Manual for the Design and Construction of Water Harvesting Schemes for Plant Production''], FAO, Rome, 1991
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits