Changes

沙坝

630 bytes removed, 05:39, 22 September 2015
no edit summary
使用人可能需要成立一个当地委员会来管理沙坝问题,诸如,控制或监督用水,防止水污染,运行与维护的实施与财政管理,以及监测还剩余多少储水可供使用(可能需要安装压强计或用螺旋钻钻孔,以便管理员或看守人判断剩余水量,并决定是否有必要采用定量配给制)。适当的管理也可帮助防止社会矛盾。沙坝现场的运行与维护任务可以指派给住在附近或在附近务农的人。如果使用人在沙坝或附近取水,这个人也可以负责水的分配,并加入监督工作。这个人需要权力明晰,并由所有使用人同意。
In order to insure success at all stages of construction, operations and maintenance, the local community needs to be trained as well to manage and maintain the dam. Promote catchment-level planning & management so that varying groups have a vested interest in the same source. They can start to addressimprovements in soil/water conservation, food production & health. Previous dam committees have shown that they tend to stop functioning effectively after the construction phase. By taking longer to build the dam, e.g. 3 stages over 3 years, it may give enough time for a catchment-based dam association to form & start functioning.为了确保建造、运行和维护的每一阶段都能成功进行,当地社区也需要接受培训,以便于管理、维护沙坝。促进流域层面的规划和管理,从而不同的群体可以享有同一水源的既得利益。他们可以开始改善土壤/水源的保护、提升粮食生产并促进健康。先前的水坝委员会倾向于在竣工后停止工作。用更多时间建造沙坝,如,3个阶段跨越3年之久,这样能有足够的时间让处于流域区的水坝协会去建立组织,开始运作。水源的保护、提升粮食生产并促进健康。先前的水坝委员会倾向于在竣工后停止实效工作。用更多时间建造沙坝,如,3个阶段跨越3年之久,这样能有足够的时间让处于流域区的水坝协会去建立组织,开始运作。
307
edits