Changes

Natural rock catchment and Open water reservoir

5 bytes removed, 05:15, 21 August 2013
Costs
* '''Range of scale:''' a range from 20 Ksh per m3 (USD 0.27), for a reservoir volume of 5000 m3 (a valley dam constructed by oxen), to 100 Ksh per m3 (1.37 USD), for a reservoir storage volume of 100 m3
[[Image:RubbleStones.jpg|thumb|right|200px|Rubble stones save about 50% of the cost of cement, sand, and ballast. <br> Photo: [http://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=3&ved=0CDcQFjAC&url=http%3A%2F%2Fwww.samsamwater.com%2Flibrary%2FBook1_Water_from_Rock_Outcrops.pdf&ei=Ys59T4_iLanM2gXA4NTlDA&usg=AFQjCNFY-XFDfUONAlG7HCp0p7Q4YDDOhw&sig2=UKAZc-rFHN-M4tfVsNOZGQ Water from Rock Outcrops.] DANIDA.]]
There are 3 types of rock catchment costs to compare:
# Earthen dams are the easiest and cheapest to construct using manual labor or animal draught (yet vulnerable to seepage, erosion, and evaporation).
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits