Changes

Natural ground catchment and Open water reservoir

No change in size, 05:33, 5 April 2012
Suitable conditions
==Suitable conditions==
* The rock that makes up the catchment should be bare and free of vegetation/soil. It should have no fractures or cracks that would result in aloss of water through seepage.* Site the dams for rock catchments to maximize the natural topography – to get the best volume, make dams on the lower side of existingrock pools.
==Construction, operations and maintenance==
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits