Changes

河床滲渠式集水廊道

86 bytes removed, 12:29, 10 November 2015
no edit summary
以下為河床滲渠式集水廊道系統的勞工、材料、以及運輸成本的參考例子。100肯亞先令=1.20美元。<br>
找出更多設置河床及水滲渠系統的相關資訊, [http://www.waterforaridland.com/docs/dryriverbeds/Water%20from%20dry%20riverbeds.zip Water from Dry Riverbeds(乾燥河岸之水)乾燥河床之取水]第四章。 Waterforaridland.com.
[[File:InfiltrationPipeCosts.jpg|500px]]
* [http://www.watersanitationhygiene.org/References/EH_KEY_REFERENCES/WATER/Surface%20Water/Designing%20Intakes%20for%20Streams%20and%20Rivers%20%28USAID%29.pdf Designing Intakes for Rivers and Streams]. Water for the World. - Lots of design diagrams and instructions on how to build a river intake system.
* [http://www.waterforaridland.com/Books/Book3%20water%20from%20dry%20riverbedspdf.pdf Water from Dry Riverbeds乾燥河床之取水]. Waterforaridland.com.
* [http://www.nwri-usa.org/pdfs/BowerSession8Presentationfinal.pdf Infiltration Gallery Testing for Integration into Dual Purpose Irrigation Systems: Managed Aquifer Recharge in Walla Walla Basin測試集水滲渠以整合雙重目的灌溉系統:沃拉沃拉盆地含水層補給管理。]. Robert Bower, 2011.
===感謝===
* CARE Nederland, Desk Study: [[Resilient WASH systems in drought-prone areas|Resilient WASH系統在易乾旱區域的適應強力]]. October 2010.
* Nissen-Petersen, Erik, [http://www.waterforaridland.com/Books/Book3%20water%20from%20dry%20riverbedspdf.pdf Water from Dry Riverbeds: How dry and sandy riverbeds can be turned into water sources by hand-dug wells, subsurface dams, weirs and sand dams乾燥河床的取水:乾燥多沙的河床如何利用手挖井、地表水壩、堰以及砂壩來變成水資源] or ([http://docs.watsan.net/Scanned_PDF_Files/Class_Code_2_Water/212.0-06WA-18985.pdf alternative link其他連結]) Danish International Development Assistance (Danida) 2006. Waterforaridland.com.
55
edits