Changes

沙坝

3 bytes removed, 04:07, 8 September 2015
no edit summary
====Akvo RSR项目====
The following project utilize sand dams.以下是利用了沙坝的项目。利用了沙坝的项目有:
<br>
{|style="border: 2px solid #e0e0e0; width: 60%; text-align: justify; background-color: #e9f5fd;" cellpadding="2"
<br>
===Manuals, videos and links指南,视频与链接===* MANUAL: 指南:[http://www.samsamwater.com/library/Sand_dam_manual_FINAL.pdf A practical guide to sand dam implementation]. Rainwater Harvesting Implementation Network (RAIN).* MANUAL: 指南:[http://www.samsamwater.com/library/Manual_on_SAND_DAMS_in_Ethiopia.pdf Manual on sand dams in Ethiopia]: A practical approach on sand dam site selection, design and construction. A tool for combining sand dams with other rainwater harvesting structures. ERHA (Ethiopian Rainwater Harvesting Association) and RAIN Foundation.* MANUAL: 指南:[http://www.internationalrivers.org/resources/before-the-deluge-coping-with-floods-in-a-changing-climate-3987 Before the Deluge: Coping with Floods in a Changing Climate]. How to adapt to floods caused by climate change. International Rivers Network.* MANUAL: 指南:[http://practicalaction.org/docs/technical_information_service/sand_dams.pdf Sand Dams: Feasible Rainwater Harvesting Technology for Arid and Semi-arid Lands]. Practical action.
* DOC: [http://wescoord.or.ke/documents/SandDams/FAQsonSandDams.doc FAQs on Sand Dams]. Provided by Excellent/ASDF with input from Dabane Trust.
====Videos视频====
{|style="font-size: 125%"
|-
307
edits