Changes

Rope pump

1 byte added, 02:11, 10 December 2013
Mozambique=
Several rope pumps were introduced in order to provide a better alternative for the Afridev Community handpump, which is the standard handpump in Malawi. The Afridev is not popular due to many breakdowns and not available spare parts, especially in the more remote areas. However, the rope pumps also broke down many times, sometimes several times per month, due to the high number of users and was therefor not considered by the users as a good alternative for a community pump, although repairs were possible. Another disadvantage mentioned was that children found it difficult to pump and sometimes got hurt when the handle security break system was not functioning (in that case the handle turns back with a high speed due to the weight of the water in the riser pipe). The communities now prefer a more reliable handpump than the Afridev, with less need for spares.
====Mozambique====
As in Malawi, the Rope pump was seen as a viable alternative to the Afridev which is generally the official pump of choice. WaterAid had first introduced a bucket and windlass system in the Niassa province as an alternative due to the high failure rate of Afridev pumps, but the Mozambican government refused to accept these as official community water supplies. WaterAid, in partnership with the Swiss Agency for Development Cooperation (SDC), UNICEF, CARE and the Government of Mozambique, therefore began a lengthy process of piloting a robust community rope pump, first relying on support from Bombas de Mecate in Nicaragua, but later adapting the design from Madagascar which is a pump model with a closed wheel cover. The new model meets a number of key well protection and water quality criteria set down by the development team. Three manufacturers were in operation in three provinces and through a process of skill sharing improvements have been made to the design resulting in a robust high quality model. A manufacturing standard has also been produced with the help of SKAT. After final stages of this process there was a final approval of the pump in 2011 as well as the licensing of the manufacturers by the Governments standards laboratory.
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits