Changes

Reinforced concrete reservoir

585 bytes added, 00:37, 24 May 2012
no edit summary
Operation consists of opening and closing the valves, and managing a chlorinator, if provided. If the reservoir does not deliver directly to a tap, water distribution is usually carried out by a caretaker. A well-designed and well-built reservoir needs very little maintenance. The surroundings must be kept clean on a regular basis; every two months the valves must be closed and opened to prevent them from sticking, and the screens must be checked. Occasionally, a screen or tap may need to be repaired. Once a year, or sooner if contamination is suspected, the reservoir must be drained, de-silted, cleaned with a brush and disinfected with chlorine. Any leaks or cracks in the concrete have to be repaired as soon as possible. If needed, a caretaker can be appointed to regulate the inflow and outflow. A concrete reservoir has few other organizational requirements.
 
==Acknowledgments==
* Brikke, François, and Bredero, Maarten. ''[http://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=2&ved=0CC0QFjAB&url=http%3A%2F%2Fwww.who.int%2Fwater_sanitation_health%2Fhygiene%2Fom%2Flinkingintro.pdf&ei=cwJpT-zaO-OiiQKCst2rBw&usg=AFQjCNEWOQhTgF3a7lzhuw5OA2KmbVGxcA&sig2=Rt2EURUyGVqDcwFg6p0xAw Linking technology choice with operation and maintenance in the context of community water supply and sanitation: A reference document for planners and project staff]''. World Health Organization and IRC Water and Sanitation Centre. Geneva, Switzerland 2003.
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits