Practitioner's Tool / Design Flow and Loading Determination Guidelines for Wastewater Treatment Plants

< Practitioner's Tool
Revision as of 19:50, 18 November 2016 by Winona (talk | contribs) (Terms and Required Data Points)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Revision as of 19:50, 18 November 2016 by Winona (talk | contribs) (Terms and Required Data Points)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The following is adapted from the Minnesota Pollution Control Agency in the United States. View the complete text online at pca.state.mn.us.

The determination of design flows and pollutant loadings is one of the most important items in the planning of a new or expanded wastewater treatment facility. A detailed analysis of existing flow conditions and the use of adequate flow estimates will determine the hydraulic and pollutant removal capacity needed to properly treat the wastewater and comply with permit conditions. It is necessary to include all contributing flow streams and pollutant loading sources in this analysis, including all residential, seasonal, institutional, commercial, industrial, inflow, infiltration, return and recycle streams and any other unique aspect of flow and pollutant contributions.

These guidelines are the recommended procedures for estimating the design flow and pollutant loading conditions and are considered to be the minimum values necessary to assure adequate treatment facility capacity. It is expected that sound engineering judgment will be used to determine the appropriate design conditions for each individual treatment facility and that consideration will be given to impacts of decisions on upstream and downstream unit processes.

Terms and Required Data Points

The flow monitoring period for any particular project must record flow data during critical low as well as peak wet weather flow events. Data collected during these flow periods are used to estimate the four flow conditions that are critical to the design and operation of wastewater treatment plants:

  • The average dry weather flow is the daily average flow when the groundwater is at or near normal, and a runoff condition is not occurring.
  • Average wet weather or peak month flow is the daily average flow for the wettest 30 consecutive days for mechanical plants or for the wettest 180 consecutive days for controlled discharge pond systems. The 180 consecutive days for pond systems should be based on either the storage period from approximately November 15 through May 15 or the storage period from approximately May 15 through November 15.
  • The peak hourly wet weather flow is the peak flow during the peak hour of the day at a time when the groundwater is high and a five-year one-hour storm event is occurring. To determine this five-year one-hour storm event for the specific project, please refer to the local weather service in your area.
  • The peak instantaneous wet weather flow is the peak instantaneous flow during the day at a time when the groundwater is high and a twenty-five year one-hour storm event is occurring.


Back to Source Characterization Page