Practitioner's Tool

Revision as of 19:47, 21 October 2016 by Winona (talk | contribs)

Revision as of 19:47, 21 October 2016 by Winona (talk | contribs)

To whom the tool addresses: The practitioner's tool is intended for NGOs, town engineers, and other stakeholders active on the ground, who aim to change the physical accessibility of WASH systems but lack the technical knowledge and the funds for professional assistance.

The aim of the tool: The tool tries to guide those stakeholders through the whole process from the first source assessment, through planning of the project to physical implementation and sustainable operation. (O&M). The guide is still a work in progress, so it is not finalized yet. The main objective of this tool, is simplification, so that basic previous knowledge be enough for the tool to be used.

Planning and Promotions Technology and Operation Regulatory and Local Ordinances
Planning and Promotions Overview
Overview
Planning

Bottom-up Planning Process
Bottom-up
Planning Process

Evidence Gathering
Evidence Gathering
Promotions

Rapid Technical Assessment
Rapid Technical
Assessment

Developing Promotional Campaigns
Developing
Promotional Campaigns
Promotion Plans for San Fernando City's Sewerage and Septage Program
Promotion Plans
- San Fernando City
Source Characterization

Project Description and Treatment
Project Description
and Treatment

Determining the Design Flow
Determining the Design Flow
Determining Wastewater Strength and Loading
Determining Wastewater
Strength and Loading
Determining Pretreatment Needs – Grease
Determining Pretreatment
Needs – Grease
Determining Pretreatment Needs – Commercial laundry services
Determining Pretreatment
Needs – Commercial
laundry services
Determining Pretreatment Needs – Markets
Determining Pretreatment
Needs – Markets
Determining Flow Variability
Determining
Flow Variability
Other Factors to Consider
Other Factors
to Consider
Site Evaluation

Create a Site Plan
Create a
Site Plan

Soil Depth
Soil Depth
Soil Texture and Structure
Soil Texture and Structure
Seasonally High Groundwater
Seasonally High
Groundwater
Slope and Topography
Slope and Topography
Land Use of Surrounding Lots
Land Use of Surrounding Lots
Pretreatment and Grease Management
Technology and Operation Overview
Technology and
Operation Overview
Pretreatment and Grease Management

Practitioner's Tool / Pretreatment for Markets
Pretreatment
for Markets

Costs for Sanitation Options - Markets
Costs for Sanitation
Options - Markets
Grease traps and interceptors for restaurants
Grease traps and
interceptors for restaurants
Determining Pretreatment Needs – Commercial laundry services
Lint traps for laundries and Best Management Practices (BMPs)
Sewers

Sewers Comparison
Sewers Comparison

Sewers for Buildings
Sewers for Buildings
Installation Requirements
Installation
Requirements
Practitioner's Tool / Combined Sewers
Combined Sewers
Settled Sewers
Settled Sewers
Primary Treatment

Primary Treatment Methods
Primary Treatment Methods

Septic Tanks
Septic Tanks
Vermicomposting digesters
Vermicomposting digesters
Anaerobic Baffled Reactors
Anaerobic Baffled Reactors
Sewage Lagoons
Sewage Lagoons
Types of Sewage Lagoons
Types of
Sewage Lagoons
Biogas Systems
Biogas Systems
Chinese Dome Digester
Chinese
Dome Digester
Filler icon.png
Page name
Filler icon.png
[[ ]]
width=85
[[ ]]
Filler icon.png
[[ ]]
Filler icon.png
[[ ]]
Filler icon.png
[[ ]]
Filler icon.png
[[ ]]

Acknowledgements

The Practitioner's Tool was created by the SuSanA Working Group members

Susana%20logo.png