Concrete production and drought

184 bytes added, 23:45, 4 June 2012
no edit summary
* Ensure adequate curing - this is one of the most important aspects to making strong concrete, but is often bypassed in the field due to lack of water, knowledge or organization. Adequate curing is necessary to keep the process of hydration going as long as possible – the longer the time, the stronger the concrete. This hydration process will stop once the concrete has dried out, resulting a strength of concrete according to the time of curing. Although curing can continue even for years, 7 and 28 days are normally quoted (see graph) – curing should last at least 7 days, if not longer especially in cold weather. Curing involves sprinkling water on the concrete every day as well as covering it, preferably in a shady area. Covering can be done with material like plastic or sacking, but covering in wet sand also works well, as does putting the concrete entirely in water.
 
==Reference manuals, videos, and links==
* Concrete poker vibrator, commercial products. Found at [http://www.alibaba.com/showroom/portable-concrete-poker-vibrator.html Alibaba.com.]
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits

Navigation menu